Millennium Development is a Vancouver company owned by the brothers Shahram and Peter Malek, who the company says set it up in the early 1990s. It lists projects across Metro Vancouver and in France, including L'Hermitage at 788 Richards Street, approved in 2004 with 46 City-owned homes inside. In 2006 the City chose it to build the Olympic Village, which went into receivership in 2010.

Photo: Millennium Development

Millennium Development logoLogo from the company's website[1]

Millennium Development at a glance

60 projects on record, 2 named leaders, 51 sources.

millenniumdevelopment.com ↗
the land price Millennium offered without conditions in its 2006 Olympic Village proposal, as City staff rounded it and The Globe and Mail reported it

$193 million

the land price Millennium offered without conditions in its 2006 Olympic Village proposal, as City staff rounded it and The Globe and Mail reported it[2],[3]

in the Olympic Village, of which 1,062 had been sold or rented when the receiver reported to the court in 2014

1,108 units

in the Olympic Village, of which 1,062 had been sold or rented when the receiver reported to the court in 2014[4]

owed to the City on the Olympic Village loan when the receiver listed the creditors in November 2010

$738.6 million

owed to the City on the Olympic Village loan when the receiver listed the creditors in November 2010[5]

paid by the Aquilini group in April 2014 for the City's remaining interest in the village

$91 million

paid by the Aquilini group in April 2014 for the City's remaining interest in the village[6],[7]

built inside 788 Richards Street and conveyed to the City, to replace the 43 rooms of the Passlin Hotel

46 homes

built inside 788 Richards Street and conveyed to the City, to replace the 43 rooms of the Passlin Hotel[8],[9]

Founded
In the early 1990s, according to the company[10]
Principals named in the record
The brothers Shahram Malek (Shahram Malekyazdi) and Peter Malek (Shahrokh Peter Malek)[4],[7],[11]
Developer named by City staff for 788 Richards Street
Millennium Development, in the report to Council of September 28, 2004[8]
Owner company in the 2004 design review
Millennium Robson Properties[12]
City business licence
Millennium Development Corporation, a development company office, with a licence in the data for every year from 1997 to 2015, the last one cancelled[13],[14]
Hotel company at 788 Richards Street
Millennium L'Hermitage Hotel Corp., registered November 5, 2007, and licensed as a hotel since 2008[15],[16]
Company chosen for the Olympic Village, 2006
Millennium Properties Ltd., registered in BC on April 21, 1993[2],[6],[17]
Olympic Village company placed in receivership, 2010
Millennium Southeast False Creek Properties Ltd., with Ernst and Young as receiver[18],[19]

Named in the public record

Who leads Millennium Development

  • Shahram Malek

    Co-founder and principal

    Also named Shahram Malekyazdi. The Tyee (2014) named him and his brother as the owners of Millennium Development Corp., and Business in Vancouver (2016) called them its principals. The Georgia Straight called him a director in 2014.

    From the public record[4],[7],[11],[20],[21]

  • Peter Malek

    Co-founder and principal

    Also named Shahrokh Peter Malek. Named with his brother as an owner of Millennium Development Corp. by The Tyee (2014) and as a principal by Business in Vancouver (2016).

    From the public record[4],[7],[11],[21]

60 projects in 19 cities

Projects by Millennium Development

58

Finished

0

Being built

2

Approved

0

Proposed

Projects by city

  • Burnaby15
  • Paris, France10
  • Vancouver10
  • North Vancouver4
  • Antony, France3
  • West Vancouver3
  • Boulogne-Billancourt, France2
  • Saint-Denis, France2

Showing 12 of 60

  • 2021Finished

    333 Carrall[23],[25],[31]

    333 Carrall Street, Gastown, Vancouver

    The company's past-projects list calls it Carrall, at 325 Carrall Street. BC Assessment gives 2021 as the year built at 333 Carrall Street.

    shops and rental studios

  • 2020Finished

    Étoile[23],[34],[35]

    5343 Goring Street, Brentwood, Burnaby

    Two towers of 26 and 32 storeys, approved at a 2016 public hearing and finished in 2020, Storeys reported.

    two condo towers

  • 2020Finished

    Triomphe[23],[32],[33]

    1880 Gilmore Avenue, Brentwood, Burnaby

    Burnaby's 2015 rezoning report describes a 46-storey tower with 340 homes on Gilmore Avenue.

    condo tower340 homes46 storeys

  • 2019Finished

    Carneby[25]

    1215 St. Georges Avenue, North Vancouver

    rentalAs the company lists it

  • 2018Finished

    Merchants Bank building (Millennium Gastown)[23],[29],[30]

    1 West Hastings Street, Gastown, Vancouver

    A 1913 bank building restored after pieces of its façade fell in 2014.

    heritage restoration

  • 2015Finished

    Bohème[23],[4]

    1588 East Hastings Street, Vancouver

    The company lists 102 homes and 24,000 square feet of shops and offices.

    homes over shops and offices

  • 2015Finished

    One Madison Avenue[23]

    4208 to 4250 Dawson Street, Brentwood, Burnaby

    The company lists 3 towers with 134 suites, 12 townhouses and 8 shops.

    condo towers and townhousesAs the company lists it

  • 2013Finished

    Alexandra[23],[28],[4]

    1221 Bidwell Street, West End, Vancouver

    BC Assessment gives 2013 as the year built for its 85 strata lots on the 2026 tax roll.

    condo tower

  • 2010Finished

    Millennium's Olympic Village (Millennium Water)[2],[6],[4],[23]

    1693 Manitoba Street, Southeast False Creek, Vancouver

    Built for the 2010 Winter Games. Placed in receivership in November 2010 and sold as The Village on False Creek.

    mixed use1,108 homes

  • 2008Finished

    L'Hermitage[8],[12],[22],[9],[23]

    788 Richards Street, Downtown, Vancouver

    Approved in 2004 as a 29-storey design with a hotel, homes and 46 City-owned homes for low-income residents, which opened in May 2008.

    hotel and homes

    See the building and its homes for sale →
  • 2007Finished

    Belvedere[23]

    6823 Station Hill Drive, Burnaby

    The company lists 22 storeys and 114 homes.

    condo towerAs the company lists it

  • 2007Finished

    City in the Park[23],[27]

    Station Hill Drive, Burnaby

    The company lists 7 towers on 16 acres, built from 1991 to 2007.

    master-planned communityAs the company lists it

7 photos of finished buildings

Millennium Development buildings, in photos

A mid-rise building of the Olympic Village at dusk, lit above a public plaza beside False Creek, with downtown Vancouver across the water
Millennium's Olympic Village, Southeast False Creek, VancouverPhoto: Millennium Development
Lumière, a pale stone and glass tower with townhomes at its base, in front of a marina and a forested park
Lumière, 1863 to 1871 Alberni Street, VancouverPhoto: Millennium Development
Bohème, a four-storey white brick building with shops at street level on East Hastings Street
Bohème, 1588 East Hastings Street, VancouverPhoto: Millennium Development
The Province Building, a brick and stone heritage office building on a street corner on West Hastings Street
The Province Building, 198 West Hastings Street, VancouverPhoto: Millennium Development
A row of townhouses in front of a tall residential tower at One Madison Avenue in Burnaby
One Madison Avenue, Dawson Street, BurnabyPhoto: Millennium Development
Residential towers of City in the Park around formal gardens with a fountain in Burnaby
City in the Park, Station Hill Drive, BurnabyPhoto: Millennium Development
Edgewater, a tall sandstone-coloured tower with an arched roof, behind magnolia trees in West Vancouver
Edgewater, 2288 Belleville Avenue, West VancouverPhoto: Millennium Development

39 dated steps

Timeline

From 1984 to February 2025.

  1. 1984

    Regency Place in West Vancouver is finished, the earliest year the company lists for any project.[25]

  2. 1987

    The company says Shahram Malek began developing in the Vancouver area with an apartment tower in Burnaby and a mall in White Rock.[38]

  3. April 21, 1993

    Millennium Properties Ltd., the company the City later chose for the Olympic Village, is registered in British Columbia.[17],[2]

  4. October 21, 1997

    The City issues its first licence in the data to Millennium Development Corporation as a development company office.[13]

  5. 2002

    BC Assessment gives 2002 as the year built for Lumière at 1863 Alberni Street.[24],[23]

  6. August 4, 2004

    The Urban Design Panel supports the 29-storey design for 788 Richards Street by 8 votes to 0.[12]

  7. August 31, 2004

    Thirty of the 32 Passlin Hotel tenants move out under agreements with the former owner.[8]

  8. October 5, 2004

    Council approves the extra floor area, a $720,000 City payment and the permit to demolish the Passlin's 43 rooms.[9],[8]

19 chapters

The Millennium Development story

From the public record, in time order. Each number in brackets links to its source.

01

Millennium Development in its own words, and in the record

Millennium Development is a family company based in Vancouver. Its website says the brothers Shahram and Peter Malek established it in the early 1990s, and that its work covers master-planned communities, mixed-use buildings, residential towers, shopping centres, office buildings and industrial centres. The site also says the family moved to Vancouver from Iran in 1981 and started again in a shared one-room office.[10]

Independent sources name the same two men. Vancouver Magazine described Shahram and Peter Malek in April 2009 as the brothers behind Millennium. The Tyee reported in April 2014 that Millennium Development Corp. is owned by the brothers Peter Shahrokh Malek and Shahram Malekyazdi, and Business in Vancouver called them the company's principals in 2016. The company's own pages use both family names, Malek and Malekyazdi.[11],[4],[7],[21]

Most news coverage of the company concerns the Olympic Village at Southeast False Creek, which housed athletes at the 2010 Winter Games and went into receivership in November 2010. This page tells that story from City reports and named news. It also covers the company's other projects, which the company lists in Vancouver, Burnaby, North Vancouver, West Vancouver, White Rock, Coquitlam, Delta and France, and the one Millennium building on this site, L'Hermitage at 788 Richards Street.[6],[19],[23],[25],[37]

02

The first projects, 1984 to 1999

A 2013 copy of the company's site says Shahram Malek began developing in the Vancouver area in 1987 with an apartment tower in Burnaby and a mall in White Rock, and that he and his brother set up Millennium Development Corporation in the 1990s. The company's list of past projects starts earlier. It gives 1984 for Regency Place at 2408 Haywood Avenue in West Vancouver, and 1987 for both Carlton on the Park at 4350 Beresford Street in Burnaby and Windsor Square Shopping Centre at 1959 152 Street in White Rock.[38],[25]

The same list names two shopping centres finished in 1990: Sunwood Square at 3025 Lougheed Highway in Coquitlam and Sunshine Village at 6345 120 Street in Delta. The company says Sunwood Square has 220,000 square feet and held the first Safeway Superstore in Canada. Homes followed, as the company lists them: Carlton at the Club at 1327 East Keith Road in North Vancouver in 1992, St Andrews at Deer Lake in Burnaby in 1995 and The Bristol at Hampton Place in 1995.[25],[23]

OrgBook BC, the provincial business registry, lists Millennium Properties Ltd. as registered on April 21, 1993. The City of Vancouver's open data show its first licence to Millennium Development Corporation, as a development company office, issued on October 21, 1997. The company lists the restoration of the Province Building, a 1908 heritage office building at 198 West Hastings Street, as finished in 1998. It lists Edgewater, a tower at 2288 Belleville Avenue in West Vancouver, for 1999 and says it holds 12 one-per-floor homes and 3 townhomes.[17],[13],[23],[25]

03

Company names in the public record

City records use several names for the Millennium companies. The City's business licence data list Millennium Development Corporation as a development company office every year from 1997 to 2015, with the first licence issued on October 21, 1997 and offices on Burrard Street, West Hastings Street, West 2nd Avenue, West 1st Avenue and Robson Street before the last licence, at 788 Richards Street, was cancelled.[13],[14]

For 788 Richards Street, the City's 2004 report names the developer as Millennium Development, and the Urban Design Panel minutes name the owner as Millennium Robson Properties. For the Olympic Village, the City's 2006 report names Millennium Properties Limited, which OrgBook BC, the provincial business registry, lists as Millennium Properties Ltd., registered on April 21, 1993. A company named Millennium Development Corporation in OrgBook BC was registered in 2013, after both projects, so this page gives no single legal name for the group.[8],[12],[2],[17],[44]

Other sources use other names again. Metro-Can Construction's project page for 788 Richards Street names Millennium Development Group, and the Skyscraper Center database names Millennium Northmount Properties as the developer. OrgBook BC lists a Millennium Northmount Properties Ltd. registered on March 31, 2017, nine years after the building was finished. The North Shore News named Millennium Northmount Properties in 2018 as the company paying for extra density at the Central Lonsdale tower in North Vancouver. The Georgia Straight's 2010 list of Olympic Village creditors names Millennium Development Corp. and Millennium Property Management Ltd.[45],[46],[47],[36],[5]

Single projects were held by their own companies. The Olympic Village belonged to Millennium Southeast False Creek Properties Ltd., the company the receiver took over in November 2010. The Tyee called the same project company SEFC Properties Inc. when it filed for bankruptcy in 2014, and reported that Millennium Development Corp. had founded it. Lexpert reported that the Evelyn site in West Vancouver was owned by Evelyn Properties Ltd. and named the Millennium Group as the company that assembled the site and won its zoning. The hotel at 788 Richards Street is licensed to Millennium L'Hermitage Hotel Corp.[18],[19],[4],[42],[16]

04

City in the Park and other Burnaby towers, 1991 to 2015

The company lists 14 projects in Burnaby, more than in any other city on its site. By the company's account, City in the Park on Station Hill Drive has 7 towers on 16 acres, built from 1991 to 2007, with 85 percent of the land kept for parks and gardens. The company's 2013 awards page names its phases: The Savoy Carlton at 6888 Station Hill Drive in 1991, Belgravia at 6838 in 1996, Claridges at 6837 in 1999, Mayfair Place on Sandborne Avenue in 2002 and Villa Jardin at 6833 in 2004. Belvedere, at 6823 Station Hill Drive, is listed for 2007 with 22 storeys and 114 homes.[23],[25],[27]

Near Brentwood Town Centre, the company lists One Madison Avenue I at 2345 Madison Avenue, finished in 2007, and One Madison Avenue at 4208 to 4250 Dawson Street, finished in 2015. It describes the second as 3 towers with 134 suites, 12 townhouses and 8 shops. One University Crescent, at 9388 to 9398 University Crescent, is listed for 2005. The company's awards page lists Georgie Awards from the Canadian Home Builders' Association and awards from the Urban Development Institute for several of these buildings. This page could not find the awarding bodies' own winners lists for those years, so the awards appear here only as the company's claims.[23],[25],[27]

05

Projects in Paris and nearby towns, as the company lists them

The company's website has a page of projects in France. It says Millennium completed 19 residential and 6 mixed-use projects in Paris and the surrounding area, and it lists 25 of them by name with street addresses. They are in Paris and in towns around it, including Antony, Boulogne-Billancourt, Saint-Denis, Montrouge, Asnieres-sur-Seine, Châtillon, Cergy, Guyancourt, Taverny and Saint-Witz, with one in Belfort. The page gives no completion years.[37]

A 2013 copy of the company's page about the founders says the brothers' parents moved to Paris in 1989, where their father began building suburban apartment complexes, and calls Millennium part of a larger group of companies that developed properties in Europe. It names East Side at Marne-la-Vallée, Bellevue Park, Bussy-Saint-Georges and Regent Park outside Paris. This page found no French public record for these projects, so the project list shows them as the company gives them.[38],[37]

06

Lumière, Brownstone and One Park Lane, 2002 to 2005

Lumière stands at 1863 to 1871 Alberni Street, near Coal Harbour. The company describes it as a 19-storey concrete tower in which every home has a corner view, and lists it as finished in 2002. The City's 2026 tax roll shows 62 strata lots at 1863 Alberni Street, with 2002 as BC Assessment's year built and RM-6 zoning, a City zone for apartment buildings.[23],[24]

Brownstone, at 2933 to 2957 Laurel Street and 902 to 932 West 13th Avenue, is listed by the company as finished in 2004, and the tax roll gives 2004 as the year built at 2933 Laurel Street. The company lists One Park Lane at 170 West 1st Street in North Vancouver and One University Crescent in Burnaby, both for 2005. Its awards page says Brownstone was a finalist for a national award from the Canadian Home Builders' Association. This page could not confirm that on the association's own list.[25],[26],[27]

07

The Passlin Hotel at Robson and Richards, 2003 to 2004

The site at the northeast corner of Robson Street and Richards Street ran 300 feet along Richards Street and 120 feet deep. Its northern part held the Passlin Hotel at 746 Richards Street, a rooming house licensed for 43 rooms, of which the City's 2003 survey found 40 in use. A smaller building held a shop and two homes, and the rest was surface parking. The Passlin was protected by the City's Single Room Accommodation By-law of 2003, so its rooms could only be demolished with Council approval.[8]

City staff had expected Millennium to arrange the tenants' moves after buying the hotel. The 2004 report says the former owner instead signed agreements with all 32 tenants to end their tenancies, and 30 left on August 31, 2004. Each received the last month's rent toward moving costs. Staff wrote that the rooms would sit empty until construction began the next spring.[8]

08

The approval of 788 Richards Street, August to October 2004

The Urban Design Panel reviewed the 29-storey design on August 4, 2004 and supported it by 8 votes to 0. The plan held a grocery store, a hotel, homes and 46 new homes for low-income residents as their own building, with a proposed height of 285 feet under a protected public view. The panel asked for better design of the low-cost housing building and the lane side, and supported a bridge over the lane to the Westin Grand hotel.[12]

Millennium agreed to replace the Passlin's 43 rooms with 46 self-contained homes in return for extra floor area. The City allowed 99,639 square feet more than the zoning gave, 75,000 of it for market homes, and Council approved the plan on October 5, 2004. The Development Permit Board approved permit DE408641 on October 12, 2004, with a condition that the hotel rooms stay hotel rooms. A former Passlin tenant spoke in support with reservations, and speakers from the Kingston Hotel across the street asked for less shadow on their side.[8],[9],[22]

“It was noted the tower placement on the site allows the low-cost housing component to be distinguished as a separate presence on the northerly edge of the site.”
City of Vancouver, Development Permit Board minutes, October 12, 2004, recording the City's development planner[22]
09

The Doug Storey Building, the City's 46 homes, 2008

The developer built the 46 homes inside 788 Richards Street and conveyed them to the City as an air space parcel, a titled block of space inside the building. The City's Director of Real Estate Services valued the extra floor area at $5,045,000, the City paid $720,000 from development cost levies for one more floor, and staff put the value of the 46 homes at $5,765,000.[8]

Council chose Coast Foundation Society to run the homes on July 10, 2007. A City report of August 14, 2009 says the Doug Storey Building was completed and tenanted in May 2008, that Coast runs its 46 units for low-income singles without subsidy, and that BC Housing oversees it for the City. The report describes the building as part of a mixed-use development that also includes commercial and hotel uses and condominiums.[9]

What the 46 homes at 788 Richards Street were worth, in the City's 2004 estimate[8]
  • Value of the extra floor area granted to the developer, set by the City's Director of Real Estate Services$5,045,000
  • City payment for one more floor of low-cost homes, from development cost levies$720,000

Total$5,765,000

City staff estimate in the report to Council of September 28, 2004. It leaves out land costs and 9 parking spaces.

10

The tower and the L'Hermitage Hotel, 2007 to 2026

Millennium L'Hermitage Hotel Corp. was registered in British Columbia on November 5, 2007, and the City issued it a hotel licence at 788 Richards Street on April 30, 2008. City data show that licence renewed every year to 2026. The Skyscraper Center database lists the building as L'Hermitage Vancouver, a residential and hotel tower of 28 floors and 86 metres finished in 2008, with 182 apartments and 60 hotel rooms, and names Millennium Northmount Properties as developer.[15],[16],[46],[48],[49]

Metro-Can Construction lists the building among its own projects as a 288,000 square foot concrete structure with 60 hotel rooms, 190 residential units and four levels of parking below ground, and names Millennium Development Group. A March 2008 press release on the hotel's website said Boutique Hotels & Resorts of British Columbia was adding the 60-suite hotel to its group and that it would open in May 2008.[45],[50]

11

Chosen for the Olympic Village, 2005 to 2006

The City began looking for a developer for the first phase of Southeast False Creek in August 2005. Five teams answered: Concord Pacific, Concert Properties, Millennium Properties, Wall Financial and Windmill Developments. Concert withdrew, Council approved the other four as a short list on October 18, 2005, and Windmill withdrew before the request for proposals closed on March 3, 2006. Proposals came in from Concord, Millennium and Wall.[2]

The City's report for the Council meeting of April 4, 2006 says the evaluation committee voted unanimously to recommend Millennium. It gave three reasons: the proposal met or exceeded the area plan, staff believed Millennium could finish the village on time, and its purchase price was the highest of the three, unconditional and with no risk sharing for the City. The report rounds that price to $193 million and says Millennium's financing plan did not depend on presales or market conditions. The City kept title to the land until after the Games, and its 2014 account gives the final land price as $200 million after an added parcel.[2],[3],[6]

Business in Vancouver reported in 2016 that a 2009 KPMG report for the City scored Millennium lowest of the three shortlisted developers while its land offer was the highest, and that Millennium never paid the City for the land. The Tyee reported in April 2014 that SEFC Properties Inc., the Olympic Village company, was founded by Millennium Development Corp., the name the City's licence data give the Millennium development office from 1997 to 2015.[7],[4],[13]

12

Financing, Fortress and the City's guarantee, 2007 to 2009

Between June and September 2007, Millennium arranged $750 million in financing from Fortress Credit Corp. Council approved a $190 million financial guarantee and a completion guarantee as part of that loan. The City's 2014 backgrounder says the completion guarantee exposed the City to the entire financial risk of the project. The Globe and Mail reported in January 2009 that Council had agreed to the completion guarantee at a closed meeting in June 2007, and that Canadian banks had been reluctant to lend on the project.[6],[3]

From May to August 2008, Fortress said the loan was out of balance because of cost overruns, and in September 2008 it stopped advancing money. In October 2008 the City, as guarantor, began paying construction bills itself. CTV reported that Council approved a loan of up to $100 million at a closed meeting on October 14, 2008, and that the decision became public on November 6, during the civic election campaign. In a statement reported by CTV the next day, Shahram Malek said any money loaned was fully secured by the real estate and other assets.[6],[40],[39]

After the election, Mayor Gregor Robertson asked for a review of the project and Council appointed the accounting firm KPMG as auditor. In January 2009 the City published the financing agreement, and the Province amended the Vancouver Charter so the City could borrow and lend money to finish the village. In February 2009 the City bought the Fortress loan, with $319 million outstanding, and became Millennium's lender. It raised the money through a group of Canadian banks and its own bonds and short-term notes.[6]

Handover to the Games organizers began in November 2009. The City's backgrounder estimates that 2,800 athletes and officials lived in the village during the Games, and says the community received LEED Platinum status, a green building rating, at that time. The organizers returned the village to the City in April 2010. The Globe and Mail reported that the first condos had not all sold and that a second sales launch planned for spring 2008 had been cancelled.[6],[3]

13

Default and receivership, August to November 2010

The City's backgrounder says Millennium defaulted on the City's loan in August 2010. On September 30, 2010, the City announced that Millennium was $8 million short on a $200 million payment, CTV reported, with another $75 million due in January. Millennium said in a statement that it was in active negotiations with the City. CTV counted 223 presales in 2008 and 36 more sales after the finished units went on the market in May 2010, which left 454 condos without a buyer.[6],[41]

On November 17, 2010, the City announced a negotiated agreement with the developer to place the project in receivership. Receivership is a court process in which a manager, the receiver, takes control of a borrower's property so it can be sold and the lender repaid. Ernst and Young became receiver of Millennium Southeast False Creek Properties Ltd. The Georgia Straight reported that the receiver, Larry Prentice, said he had taken over management of the company and replaced Millennium's executives and directors.[6],[19],[18]

The receiver's list of creditors, reported by the Georgia Straight on November 29, 2010, showed $738.6 million owed to the City on its secured loan and $65.8 million owed to other creditors. The other creditors included Millennium Development Corp., owed $62.6 million, and Millennium Property Management Ltd., owed $289,230.93. The Straight gave the property's book value as $629.4 million. Mayor Robertson told CTV that recovering the full investment would be difficult and would depend on a strong market.[5],[19]

14

Sales, settlement and the sale to Aquilini, 2011 to 2016

When the receivership began, the City says it negotiated a settlement with Millennium Development and the other guarantors and took 32 properties that had backed the loan guarantees. The Tyee reported in 2014 that in early 2011 the City gave up a $1 billion claim against Millennium, and that the properties, in Vancouver, Burnaby, Whistler and Toronto, were expected to bring in up to $70 million. The City's 2014 account says it later sold all but one of them. In April 2011 city manager Penny Ballem estimated a $48 million loss for the City, which left out the $171 million land cost, The Tyee reported.[6],[4]

Rennie Marketing Systems relaunched sales in February 2011 under a new name, The Village on False Creek. Prices of unsold units were cut by 30 to 50 percent in early 2011, and more than 50 buyers from earlier years, who objected to the price cuts, sued the City for refunds, according to The Tyee. In 2013 the receiver sold the market rental buildings to BK Prime for $40.5 million and the commercial buildings to First Capital for $45.1 million. SEFC Properties Inc. filed for bankruptcy through its receiver on March 12, 2014, with the City as its secured creditor.[6],[4]

In April 2014 the City sold its remaining interest to the Aquilini group for $91 million. It said it retired $630 million of outside debt, repaid $60 million of its working capital and recovered another $70 million. Business in Vancouver reported in 2016, from documents released under freedom of information, that the City needed Millennium's co-operation to close that sale. An agreement dated April 4, 2014 released Millennium from the loan, restructuring and ground lease agreements and committed the City to a plaque on site naming Peter and Shahram Malek and the Millennium Group of Companies. The sale documents also showed $1.2 million in payments to the Maleks and Millennium companies.[6],[7]

A 2025 book by Richard Littlemore, City Builders: The Maleks, The Olympics, and a Historic Gift to Vancouver, tells the brothers' side. Its publisher's description says the City forced the project into insolvency, meaning it could no longer pay its debts, and took everything the brothers owned except their homes. The City's 2014 backgrounder lists what the community received, including 252 affordable homes in the first phase and 25.8 acres of public open space in Southeast False Creek.[43],[6]

15

Evelyn in West Vancouver, 2008 to 2011

Evelyn was a planned community on 20 acres above Park Royal shopping centre. A 2014 copy of the company's site says Millennium spent 7 years working with the District of West Vancouver, the community and the architects Arthur Erickson and Nick Milkovich to rezone and design it. CTV reported in November 2008 that 349 homes were planned on eight hectares, 176 of them in a first phase. It also reported that construction had stopped the month before and that some unpaid contractors had registered liens, which are claims against a property for money owed.[51],[39]

Lexpert, a legal business publication, reported in November 2011 that two lenders began court steps to recover their loans from the owner, Evelyn Properties Ltd., in December 2010, after the loans defaulted. The Bowra Group was appointed receiver of the project in March 2011. Onni Development Corp. then bought the shares of Evelyn Properties Ltd., and its debts of more than $150 million were restructured. Lexpert named the Millennium Group as the company that had assembled the site and obtained its zoning.[42]

16

Projects after the Olympic Village, 2013 to 2026

The Tyee named two projects as Millennium's latest in 2014: the Alexandra tower in the West End and the Bohème condominiums on East Hastings Street. The City's tax roll shows 85 strata lots at 1221 Bidwell Street, the Alexandra's address in the company's list, with 2013 as BC Assessment's year built and CD-1 (489) zoning, a zone written for that site. The company says the tower kept a heritage façade and was built to the LEED Gold green building standard. It lists Bohème at 1588 East Hastings Street, finished in 2015, with 102 homes over shops and offices.[4],[28],[23]

In Gastown, the Georgia Straight reported in January 2018 that Millennium manages the Merchants Bank building at 1 West Hastings Street, which the company dates to 1913. Pieces of its façade fell into Pioneer Place, the park next door, in 2014, and the building stood in scaffolding for three years. SkyriseVancouver reported in December 2017 that the restoration, with a reclaimed limestone façade, was nearing completion. The company lists a second Gastown project at 333 Carrall Street, with shops and rental studios, and the tax roll gives 2021 as its year built.[29],[30],[23],[31]

In Burnaby's Brentwood area, the company lists Triomphe at 1880 Gilmore Avenue and Étoile at 5343 Goring Street, both finished in 2020. Burnaby's 2015 staff report describes the Gilmore Avenue rezoning as a 46-storey tower with 340 homes, and Grosvenor, which says it committed $13.9 million to Millennium's Triomphe in 2015, says construction finished in 2020. Storeys reported in November 2023 that Burnaby Council gave final approval to Étoile Gold, a 47-storey Millennium tower with 274 condos and 102 rental homes, beside the two Étoile towers of 26 and 32 storeys.[23],[32],[33],[35],[34]

In North Vancouver, City Council voted 6 to 1 on September 17, 2018 to approve an 18-storey building with 162 homes on East 13th Street, the North Shore News reported. To reach the approved density, Millennium Northmount Properties agreed to pay $6.4 million for extra floor area and to buy 41,302 square feet from a City-owned site at $260 a square foot. The company calls the project Millennium Central Lonsdale and gives 2024 for its completion. It also lists Carneby, a rental building at 1215 St. Georges Avenue, finished in 2019.[36],[23],[25]

17

Court cases and disputes in the record, 2008 to 2018

In November 2008, CTV reported unpaid contractors' liens on the Evelyn site and quoted a member of a Nanaimo hotel design committee who said a Millennium hotel project there was behind its original schedule. The Olympic Village project company went into receivership in November 2010 under an agreement with the City, its lender. The Evelyn project went into receivership in March 2011, and the Olympic Village company filed for bankruptcy in March 2014.[39],[19],[42],[4]

In Burnaby, Millennium went to the BC Supreme Court over 1846 Gilmore Avenue, a lot inside the site that Burnaby's 2015 report describes for a 46-storey tower. The Georgia Straight reported in August 2014 that the tenant, International Sausage House Ltd., claimed a right of first refusal to buy the property and an extended lease, and that Millennium asked the court for a declaration against those claims. On July 29, 2014, Justice Stephen Kelleher ruled that the disputed facts needed a full trial, which he set for January 26, 2015. Burnaby's report says an owner's objection had led to the rezoning being withdrawn from a March 2013 public hearing, and that the ownership interests were later resolved.[20],[32]

More than 50 Olympic Village buyers who objected to the 2011 price cuts sued the City of Vancouver for refunds, The Tyee reported in 2014; the City was the defendant in that case. In Gastown, local advocates objected in January 2018 to a restaurant patio in Pigeon Park offered in Millennium's lease advertisement for the Merchants Bank building, the Georgia Straight reported, and a City spokesperson said a patio on that public land would need a City permit.[4],[29]

18

Architects and builders named with Millennium

Gomberoff Bell Lyon Architects was the applicant and architect in the 2004 City records, and Durante Kreuk Landscape Architects attended the Development Permit Board meeting for the landscape design. The hotel's 2008 press release also names Lawrence Doyle Architects, and the Skyscraper Center lists B+H Architects for the interiors. At the Board meeting, the City's senior housing officer explained the housing agreement that would secure the 46 homes for the City.[12],[22],[50],[46]

Metro-Can Construction lists L'Hermitage among its projects without stating its role. The Tyee's 2014 report lists a Metro-Can Construction company among the creditors of the Olympic Village company. Coast Foundation Society runs the City's homes in the building, and Millennium L'Hermitage Hotel Corp. holds the hotel licence.[45],[4],[9],[16]

For the Olympic Village, the City's 2006 report lists 17 firms in Millennium's team. Merrick Architecture Borowski Lintott Sakumoto Fligg led the architects, with Gomberoff Bell Lyon, Thornly BKG and Durante Kreuk, and the construction team was MetroCan, Norson and Millennium Construction. In Burnaby, the 2015 report names Chris Dikeakos Architects as the applicant for the Gilmore Avenue tower, the 2016 hearing record names CDA Architects for the Goring Street towers, and Storeys names Chris Dikeakos Architects for Étoile Gold.[2],[32],[34],[35]

19

What the project list on this page leaves out

The project list holds one row for each named project on the company's website, past and present, plus Étoile Gold from news coverage. Rows that rest only on the company's site carry the label As the company lists it. Years are the company's, except where the City's tax roll or a news report gives one. The company's year for Regency Place, 1984, comes before the 1987 start that its own 2013 page about the founders describes.[23],[25],[37],[38]

Some projects are left off the list. St James Gate at 2253 Welcher Avenue, which the company lists for 1994, has no city in the company's list. Evelyn passed to Onni in 2011, and no source gives the name or outcome of the Nanaimo hotel CTV mentioned in 2008. The company's awards page lists Georgie Awards, Urban Development Institute awards and a 2010 Canada Mortgage and Housing Corporation award for L'Hermitage. This page could not find the awarding bodies' lists for those years, so the awards stay out of the rows.[25],[42],[39],[27]

Questions about Millennium Development

Who is Millennium Development?

Millennium Development is a Vancouver development company owned by the brothers Shahram and Peter Malek, according to The Tyee and Business in Vancouver. The City's licence data list Millennium Development Corporation as a development company office in every year from 1997 to 2015. City staff named Millennium Development as the developer of 788 Richards Street in 2004, and in 2006 the City chose Millennium Properties Ltd. to build the Olympic Village.[4],[7],[13],[14],[8],[2]

Who owns Millennium Development?

Millennium Development is owned by the brothers Shahram Malek, also named Shahram Malekyazdi, and Peter Malek, also named Shahrokh Peter Malek, The Tyee reported in April 2014. Business in Vancouver called them the company's principals in 2016, and Vancouver Magazine described them as the brothers behind Millennium in 2009. The company's own website says the brothers established it and that it is family owned and operated.[4],[7],[11],[10]

When was Millennium Development founded?

Millennium Development gives no single founding year. Its website says the brothers Shahram and Peter Malek established it in the early 1990s, and a 2013 copy of the site says Shahram Malek began developing in the Vancouver area in 1987. OrgBook BC lists Millennium Properties Ltd., the company the City chose for the Olympic Village, as registered on April 21, 1993. The City's licence data first list Millennium Development Corporation in 1997.[10],[38],[17],[13]

Does Millennium Development have a website?

Yes. Millennium Development's website is millenniumdevelopment.com. It lists the company's current and past projects in British Columbia and its projects in France, describes its service for new home owners, and has pages about the company and about careers. The project years and descriptions on the site are the company's own statements, and the project list on this page marks the rows that rest only on them.[1],[23],[25],[37]

What projects has Millennium Development built?

Millennium Development lists projects in Vancouver, Burnaby, North Vancouver, West Vancouver, White Rock, Coquitlam and Delta, and 25 in and around Paris. In Vancouver they include L'Hermitage at 788 Richards Street, Lumière on Alberni Street, the Alexandra on Bidwell Street, Bohème on East Hastings Street and the Olympic Village. In Burnaby they include City in the Park on Station Hill Drive, One Madison Avenue, Triomphe and Étoile.[23],[25],[37]

What did Millennium Development build at 788 Richards Street?

Millennium Development developed the mixed-use tower at 788 Richards Street, known on listing sites as L'Hermitage. The 2004 approval covered a 29-storey building with a grocery store, a hotel, homes and 46 City-owned homes for low-income residents. The City's homes opened in May 2008, and the hotel was first licensed on April 30, 2008.[8],[12],[22],[16],[9]

What did the City receive from Millennium at 788 Richards Street?

Millennium Development built 46 self-contained homes inside 788 Richards Street and conveyed them to the City as an air space parcel, in return for 99,639 square feet of extra floor area. City staff valued the homes at $5,765,000, including a $720,000 City payment. The homes, now the Doug Storey Building, opened in May 2008.[8],[9]

Who designed Millennium's tower at 788 Richards Street?

Gomberoff Bell Lyon Architects was the applicant and architect for 788 Richards Street in the 2004 City records, with Durante Kreuk Landscape Architects on the landscape. The hotel's 2008 press release also names Lawrence Doyle Architects, and the Skyscraper Center database lists B+H Architects for the interiors of the building.[12],[22],[50],[46]

Did Millennium Development build the Olympic Village?

In April 2006 the City chose Millennium Properties Ltd. to design and build the buildings of the Olympic Village in Southeast False Creek, at a final land price of $200 million. The project housed athletes for the 2010 Winter Games. Millennium defaulted on the City's loan in August 2010, and the project went into receivership in November 2010.[2],[6]

Why did the Olympic Village go into receivership?

The Olympic Village went into receivership on November 17, 2010, after Millennium defaulted on the City of Vancouver's loan in August 2010. The first lender, Fortress, had stopped advancing money in September 2008, and the City, which had backed the loan with a guarantee, bought it in February 2009. CTV reported that Millennium was $8 million short on a $200 million payment and that 454 condos were unsold. The City and Millennium agreed to the receivership, with Ernst and Young as receiver.[6],[41],[19]

What happened to the Olympic Village company?

The Olympic Village project went into receivership on November 17, 2010, with Ernst and Young as receiver, after Millennium defaulted on the City's loan. The City took 32 properties from Millennium Development and other guarantors. SEFC Properties Inc., the Olympic Village company, filed for bankruptcy on March 12, 2014, and the City retired the project's outside debt that April.[4],[6]

Did Millennium pay for the Olympic Village land?

Business in Vancouver reported in 2016 that Millennium never paid the City for the Olympic Village land. The City's 2006 report records Millennium's unconditional offer, rounded to $193 million, and the City's 2014 backgrounder gives a final price of $200 million after an added parcel. The City kept title to the land until after the Games. The Tyee reported that the City's 2011 loss estimate of $48 million left out the $171 million land cost.[7],[2],[6],[4]

What happened to Millennium's Evelyn project in West Vancouver?

Construction at Evelyn, Millennium's planned community above Park Royal in West Vancouver, stopped in October 2008, and CTV reported liens from unpaid contractors. Lenders began court steps against the owner, Evelyn Properties Ltd., in December 2010, and The Bowra Group became receiver in March 2011. Lexpert reported in November 2011 that Onni Development Corp. had bought the shares of Evelyn Properties Ltd. and restructured its debts of more than $150 million.[39],[42]

Is Millennium Development still building?

Yes. After the Olympic Village, Millennium's Alexandra in the West End was finished in 2013, according to BC Assessment's year built, and the company lists Bohème in 2015 and Triomphe and Étoile in Burnaby in 2020. North Vancouver approved the company's 18-storey tower on East 13th Street in 2018, and Burnaby Council gave final approval to Millennium's 47-storey Étoile Gold tower in November 2023, Storeys reported.[28],[23],[36],[35]

What is the Merchants Bank building in Gastown?

The Merchants Bank building is a three-storey heritage bank building at 1 West Hastings Street, at the corner of Carrall Street, which Millennium manages, according to the Georgia Straight. Pieces of its façade fell into Pioneer Place in 2014, and the building stood in scaffolding for three years. SkyriseVancouver reported in December 2017 that its restoration, with a reclaimed limestone façade, was nearing completion. The company lists the project as Millennium Gastown, finished in 2018.[29],[30],[23]

What is Millennium L'Hermitage Hotel Corp.?

Millennium L'Hermitage Hotel Corp. is the company that holds the City hotel licence for the L'Hermitage Hotel at 788 Richards Street. OrgBook BC lists it as registered on November 5, 2007, and active. The City issued its first hotel licence on April 30, 2008, and has renewed it every year to 2026.[15],[16],[48],[49]

What is Millennium Development's legal name in the BC registry?

No single legal name for the Millennium group could be confirmed. The City's licence data use Millennium Development Corporation from 1997, but the OrgBook BC entry with that exact name was registered in 2013. The City's Olympic Village records name Millennium Properties Ltd., registered in 1993, and the 2004 design review names the owner of 788 Richards Street as Millennium Robson Properties.[13],[44],[17],[2],[12]

Sources

  1. [1]Millennium Development. Millennium Development Corp. (home page). Checked 2026-10-25. The company's own description. Page text read from the site's own script file.
  2. [2]City of Vancouver. Selection of a Developer for Sub-Area 2A of Southeast False Creek Including the Olympic Village (administrative report), 2006-04-03. Checked 2026-10-24. Read from the Internet Archive copy.
  3. [3]The Globe and Mail. How did things go so wrong?, 2009-01-19. Checked 2026-10-25.
  4. [4]The Tyee. The Olympic Village Developer Is Bankrupt, 2014-04-05. Checked 2026-10-24.
  5. [5]The Georgia Straight. Receiver releases list of creditors owed money over Millennium's Olympic Village, 2010-11-29. Checked 2026-10-24.
  6. [6]City of Vancouver. Olympic Village Chronology of Events and Community Benefits (backgrounder), 2014-04-28. Checked 2026-10-24. Read from the Internet Archive copy.
  7. [7]Business in Vancouver. Olympic Village: details emerge of tax loss sale, 2016-08-09. Checked 2026-10-25. Internet Archive copy.
  8. [8]City of Vancouver. 788 Richards Street: SRA Permit Application for the Passlin Hotel (746 Richards Street) and Replacement Non-market Housing (administrative report), 2004-09-28. Checked 2026-10-24. For the Council meeting of October 5, 2004; read from the Internet Archive copy.
  9. [9]City of Vancouver. Grant Request for Doug Storey Building Non-Market Housing Tenant Improvements, 788 Richards Street (administrative report), 2009-08-14. Checked 2026-10-24. Read from the Internet Archive copy.
  10. [10]Millennium Development. About Millennium. Checked 2026-10-25. The company's own description. Page text read from the site's own script file.
  11. [11]Vancouver Magazine. Editor's Note, April 2009, 2009-04-02. Checked 2026-10-25.
  12. [12]City of Vancouver. Urban Design Panel minutes, August 4, 2004, item 2: 788 Richards Street, DE408641, 2004-08-04. Checked 2026-10-24. Read from the Internet Archive copy.
  13. [13]City of Vancouver. Business licences 1997 to 2012: Millennium Development Corporation. Checked 2026-10-24. Open data.
  14. [14]City of Vancouver. Business licences 2013 to 2024: Millennium Development Corporation. Checked 2026-10-24. Open data.
  15. [15]Government of British Columbia, OrgBook BC. Millennium L'Hermitage Hotel Corp. (BC0807598). Checked 2026-10-24. Registered November 5, 2007; active.
  16. [16]City of Vancouver. Business licences 1997 to 2012: hotel licences at 788 Richards Street. Checked 2026-10-24. Open data, licence years 2008 to 2012.
  17. [17]Government of British Columbia, OrgBook BC. Millennium Properties Ltd. (BC0445196). Checked 2026-10-24. Registered April 21, 1993; active.
  18. [18]The Georgia Straight. Ernst & Young named receiver of Millennium Water Olympic Village development, 2010-11-17. Checked 2026-10-25.
  19. [19]CTV News. Receivership 'last step' for troubled Olympic Village, 2010-11-17. Checked 2026-10-25. Internet Archive copy; the original address no longer answers.
  20. [20]The Georgia Straight. Burnaby's International Sausage House squares off against condo developers, 2014-08-06. Checked 2026-10-25.
  21. [21]Millennium Development. About Millennium Development (archived copy). Checked 2026-10-25. The company's own description. Internet Archive copy of March 7, 2014.
  22. [22]City of Vancouver. Development Permit Board and Advisory Panel minutes, October 12, 2004, item 5: 788 Richards Street, DE408641, 2004-10-12. Checked 2026-10-24. Read from the Internet Archive copy.
  23. [23]Millennium Development. Portfolio: current and featured projects. Checked 2026-10-25. The company's own description. Project names, addresses and years read from the site's own script file.
  24. [24]City of Vancouver. Property tax report, 2026 roll: 1863 Alberni Street. Checked 2026-10-25. Open data; year built is BC Assessment's.
  25. [25]Millennium Development. Past projects. Checked 2026-10-25. The company's own description. Read from the site's own script file.
  26. [26]City of Vancouver. Property tax report, 2026 roll: 2933 Laurel Street. Checked 2026-10-25. Open data; year built is BC Assessment's.
  27. [27]Millennium Development. Millennium Development: Awards (archived copy). Checked 2026-10-25. The company's own description. Internet Archive copy of October 17, 2013.
  28. [28]City of Vancouver. Property tax report, 2026 roll: 1221 Bidwell Street. Checked 2026-10-25. Open data; year built is BC Assessment's.
  29. [29]The Georgia Straight. Restaurant patio proposed for Pigeon Park pits developer against activists, 2018-01-09. Checked 2026-10-25.
  30. [30]SkyriseVancouver. The Rebirth of 1 West Hastings, 2017-12-21. Checked 2026-10-25.
  31. [31]City of Vancouver. Property tax report, 2026 roll: 333 Carrall Street. Checked 2026-10-25. Open data; year built is BC Assessment's.
  32. [32]City of Burnaby. Rezoning Reference #12-21: 1846, 1876 and 1904 Gilmore Avenue (report to Council), 2015-10-21. Checked 2026-10-25.
  33. [33]Grosvenor. Triomphe. Checked 2026-10-25. The company's own description. The financier's own project page.
  34. [34]City of Burnaby. Public hearing minutes, June 28, 2016: Rezoning #15-40, 2360/2390 Douglas Road and 5343 Goring Street, 2016-06-28. Checked 2026-10-25.
  35. [35]STOREYS. Burnaby Approves 47-Storey Etoile Gold Tower Near Holdom Station, 2023-11-21. Checked 2026-10-25.
  36. [36]North Shore News. City of North Van council approves 187-foot tower, pockets $17 million, 2018-09-17. Checked 2026-10-25. Internet Archive copy; the publisher's site refuses scripts.
  37. [37]Millennium Development. Projects in France. Checked 2026-10-25. The company's own description. Read from the site's own script file.
  38. [38]Millennium Development. Shahram Malekyazdi and Peter Malek (archived copy). Checked 2026-10-25. The company's own description. Internet Archive copy of October 18, 2013.
  39. [39]CTV News. Olympic village developer insists project okay, 2008-11-07. Checked 2026-10-25. Internet Archive copy; the original address no longer answers.
  40. [40]CTV News. 2010 athletes village to get $100 million loan, 2008-11-06. Checked 2026-10-25. Internet Archive copy; the original address no longer answers.
  41. [41]CTV News. Pay back loan or else, Vancouver tells developer, 2010-09-30. Checked 2026-10-25. Internet Archive copy; the original address no longer answers.
  42. [42]Lexpert. Onni Development Completes Restructuring Of Evelyn Drive Project, 2011-11-01. Checked 2026-10-25.
  43. [43]49th Shelf. City Builders: The Maleks, The Olympics, and a Historic Gift to Vancouver, by Richard Littlemore (Barlow Books, 2025). Checked 2026-10-25. The company's own description. Book listing with the publisher's description.
  44. [44]Government of British Columbia, OrgBook BC. Millennium Development Corporation (BC0960618). Checked 2026-10-24. Registered January 22, 2013.
  45. [45]Metro-Can Construction. L'Hermitage. Checked 2026-10-24. The company's own description. The construction company's own project page.
  46. [46]Council on Tall Buildings and Urban Habitat, Skyscraper Center. L'Hermitage Vancouver. Checked 2026-10-24.
  47. [47]Government of British Columbia, OrgBook BC. Millennium Northmount Properties Ltd. (BC1113617). Checked 2026-10-24. Registered March 31, 2017; historical.
  48. [48]City of Vancouver. Business licences 2013 to 2024: hotel licences at 788 Richards Street. Checked 2026-10-24. Open data.
  49. [49]City of Vancouver. Business licences: hotel licences at 788 Richards Street, 2024 to 2026. Checked 2026-10-24. Open data.
  50. [50]L'Hermitage Hotel. Announcing the L'Hermitage Hotel in Vancouver, B.C. (press release, Boutique Hotels & Resorts of British Columbia), 2008-03-14. Checked 2026-10-24. The company's own description. Internet Archive copy of June 28, 2008.
  51. [51]Millennium Development. Evelyn Living (archived copy). Checked 2026-10-25. The company's own description. Internet Archive copy of March 7, 2014.