A depreciation report is a 30-year forecast for a strata building. It lists the parts the owners pay to look after, such as the roof, windows, elevators and parkade, says how long each should last, and estimates what replacing them will cost. If the building's savings fall short of those costs, the owners will pay the difference through higher strata fees or a special levy. Every rule below comes from the Government of British Columbia's strata pages and the Strata Property Regulation, which we read on October 24, 2026, and from the Strata Property Act and the Regulation's fee sections, which we read on November 19, 2026.
The province's requirements page says every strata corporation with five or more strata lots must get a depreciation report every five years. Buildings with four or fewer strata lots are exempt. A downtown condo tower has far more than five, so it must have one.
The rules changed on July 1, 2024. Before then, owners could vote each year by a 3/4 majority to put the report off. That option is gone. A strata in Metro Vancouver that had no report, or only one from before December 31, 2020, had to get a new one by July 1, 2026.
New buildings have their own timeline. A strata corporation created between July 1, 2024 and July 1, 2027 must get its first report within two years of its first annual general meeting. From July 1, 2027, the developer will pay part of that first report, at least $5,000 plus $200 per strata lot, up to $30,000, and the first report will be due within 18 months.
Since July 1, 2025, only members of designated professions may prepare a depreciation report. The province lists professional engineers and professional licensee engineers, architects and architectural technologists, applied science technologists and certified technicians, accredited appraisers, certified reserve planners and professional quantity surveyors. The report must name the person or firm, describe their qualifications and their errors and omissions insurance, and state their relationship to the strata corporation.
There is no set price for a depreciation report in BC. The province's practical tips page (published November 12, 2025, read November 19, 2026) says reports "will range in price, depending on the size and complexity" of the strata corporation's buildings and common assets, that the council should get estimates for the cost, and that the owners must approve it.
The owners pay through the strata corporation, in one of three ways. Section 96 of the Strata Property Act (current to November 17, 2026) lets the strata spend contingency reserve fund money on an expense "necessary to obtain a depreciation report" with a majority vote at an annual or special general meeting, where most other reserve fund spending needs a 3/4 vote. The same majority vote covers repairs the most current report recommends. The province's tips page gives the other two ways: a special levy, which needs a 3/4 vote, or a line in the operating budget, which the owners approve by majority vote when they pass the budget. Some stratas keep a professional services line in the budget for this.
From July 1, 2027, the developer of a new building pays part of the first report: at least $5,000 plus $200 per strata lot, up to $30,000, the province's requirements page says (read November 19, 2026).
As a buyer, you do not pay for the report to be made. It comes attached to the Form B, and section 4.4 of the Strata Property Regulation (current to November 17, 2026) caps the fee for that certificate, with its required attachments, at $35 plus copying of up to 25 cents a page. To see what the building paid for its report, and whether the owners chose a levy or the reserve fund, read the budget and the minutes from the year the report was ordered.
Section 6.2 of the Strata Property Regulation sets the content, and the province's page explains it in plain terms. Every report has two main parts.
The first is a physical component inventory. The preparer inspects the site and lists each part of the common property, the common assets and anything else the strata must maintain, with an estimated service life over 30 years. The province's list of items to review includes the structure, the roof, doors and windows, the electrical, heating, ventilation, air conditioning and plumbing systems, fire protection, amenities, parking, landscaping, interior finishes, and balconies and patios.
The second is a financial forecast. It projects 30 years of repair and replacement costs paid from the contingency reserve fund, which is the building's savings for costs that come up less often than once a year. It states the interest and inflation rates it assumes. It gives at least three funding models, which are different ways of paying those costs: from the reserve fund, through special levies, through higher strata fees, by borrowing, or a mix. It also shows the current reserve fund balance and how the fund is paid into today.
Since the 2024 changes, every report must also open with an executive summary.
A good report goes further than the minimum. The province's practical tips page says it should rank the work, with work that protects life and safety first, and should point out building code changes that will force an upgrade at replacement time. It can also suggest savings: a cheaper part that works as well, a better part that lasts longer, or the point where replacing something costs less than repairing it again.
You will usually receive the most recent report attached to the Form B, which the strata must give within one week of a request. Read it with the building's budget and the last two years of minutes beside you.
- The date and the preparer. A report more than five years old does not meet the rule. Check that the preparer belongs to one of the designated professions.
- The executive summary. It should tell you the main findings in a few pages. Note any part the report calls urgent or in poor condition.
- The next ten years of the cost schedule. Look for large items due soon after you would buy: a roof, windows, the building envelope (the outer walls, windows and roof that keep water out), elevators or the parkade membrane. Write down the year and the estimated cost of each.
- The reserve fund balance against those costs. Compare the current balance in the report, and the newer one on the Form B, with what the schedule says will be spent over the next few years. If the balance is lower than the costs due in the next few years, expect a special levy, higher fees or borrowing.
- Which funding model the owners follow. The province says the models are for the strata to consider, and owners do not have to adopt one. Compare the reserve contribution in the current budget with the models. If the budget pays in less than every model calls for, the difference will have to come from somewhere else later, such as a levy.
- What the minutes say about it. Minutes show whether the council discussed the report, got quotes for the work it lists or planned a vote on a special levy.
Since November 1, 2023, the province's reserve fund page says the yearly contribution must be at least 10% of the operating fund budget, and that contributions should be set with the depreciation report in mind. A building paying only the 10% minimum while its report forecasts heavy costs is one to ask questions about.
The province's practical tips page is clear about its limits. The inspection is visual. It is a different thing from a technical audit, which looks for construction and design defects and often involves opening walls and ceilings. Items meant to last the life of the building, such as foundations, are usually left out unless the preparer sees a problem. Everyday maintenance paid from the operating fund is not covered either.
The page also warns councils to check draft reports for mistakes, such as assuming every unit has the same roofing, or text copied from another client's report. A buyer can watch for the same things.
Strata corporations must also keep engineering reports and other reports on major repairs, under section 35 of the Strata Property Act. Ask the seller whether there are any. An engineer's report on the outer walls or the structure can cover problems a visual inspection does not reach.
The City's building permit records show past work as well. At L'Hermitage at 788 Richards Street, a permit issued in 2018 covered replacing the water piping through the building. A permit shows that the City approved the work; what the owners paid, and how, is in the strata's minutes and any special levy from that year, so ask for both.
Read the depreciation report together with the budget, the minutes and the Form B. Our post on what strata fees cover explains how the reserve fund and special levies work, and our post on the Form B explains each line of that certificate. The buyer's guide covers the full set of steps, and BC's rescission period gives you three business days after an accepted offer to cancel, for a fee.
If you would like a second reader on the depreciation report for a downtown condo you are considering, call us at 604-992-8612 or send a note through our contact form. Our team will be in touch within 24 hours.